Education

Finished before term starts.

Safety vinyl, carpet and hall floors for schools, planned around half-terms and holidays and installed by DBS-checked teams.

100% of our installers are DBS-checked.

What education work demands.

Works squeezed into half-terms and summer holidays

The finish date does not move, so the floor has to be surveyed, chosen and ordered before the school closes.

Safeguarding requirements on every site

Anyone working on a school site has to clear its safeguarding checks before the first tool comes out.

High-traffic corridors that must last

Busy changeovers, dragged chairs and lunchtime spills call for a heavy-wear rating, plus safety flooring wherever it gets wet.

Light grey sheet vinyl running the length of a washroom, past a row of full-height cubicles and a tiled wall

A hall and corridors, one summer.

For a primary school in the West Midlands we refurbished the hall and corridors with safety vinyl and carpet tiles, start to finish inside the summer holidays.

That is the shape of most of our school work: safety vinyl for corridors, toilets and kitchens, carpet for libraries and quiet rooms, and timber for halls.

For specifiers

What the specification needs to cover.

The points a school flooring specification normally addresses.

Durability for heavy traffic
Corridors, entrances and halls take heavy, concentrated wear. The commercial use class and wear layer, plus entrance matting at external doors, decide how long a floor lasts.
Slip resistance in wet areas
Toilets, changing rooms, kitchens and science rooms need slip-resistant safety flooring, judged on its wet pendulum test value (PTV).
Acoustics and BB93
Building Bulletin 93 sets the acoustic performance standards for schools. Floor finishes affect impact sound and reverberation, which is one reason carpet suits libraries and quiet rooms.
Sports and multi-use halls
Indoor sports floors are normally specified to BS EN 14904, which covers how a surface performs for multi-sports use.

General guidance to raise at specification stage, not a substitute for it. Always check the current documents and the manufacturer's test data for the product chosen.

Planning work for the holidays?

Send us the dates and the rooms. We will survey, quote and plan the install to finish inside the window.

Accredited and checked